Monday, November 9, 2015

Framing Has Begun

These pictures are from two separate days. It only took 3 days for the house to go from just a foundation to what you see below. Hopefully the roof is finished soon and all the windows go in. I will feel better about the weather at least once that is done. 


From the front. There is another Gable that will be added and the roof is just getting started. 

We went with the 3 car garage.

This is the morning room. We kept the standard 3 windows that are included with the morning room. 

A view from the loft looking out to the front yard.

In the garage, there is our front doo. I didnt think it would have a window, so that is a plus.

The living room. The hole is where the gas fireplace will go. We chose to do it on the side so the protruding structure isn't taking up space in the back yard where we eventually plan to add a deck. 

Here is the kitchen. To the left is the morning room. On the right side is the door to the powder room. The fridge will be inset in the gap just to the left of the powder room door. 

We chose to keep this wall open which is the dining room and the family room. We could have walled it off and created an office. We decided to keep it open as we plan to use one of the 4 bedrooms as an office upstairs. 

Looking back from the front of the family room.

Looking straight back from the family room. 

There is still a little water in the basement from a rainstorm that came through on the second day of framing. There is no lumber under water so I am not worried about it. It should help delay the curing of the floor which is better for the concrete. The far back is where we added an egress window that will also have a ladder. Makes me nervous for when our little one is old enough to want to sneak out!

I didn't expect to have doubled up joists under the basement floor. This is a huge plus to me. As long as it was all glued and screwed it should make for a solid and squeak  free floor. 

The basement will be finished, here is the lumber. To the left you can see the rough ins for the 3 piece bathroom. I am going to finish the bathroom myself later on. I can do it cheaper myself and with the rough in, it wont be very complicated. 

Here is the loft. The far room will be our office

The front of the photo is the laundry room. The two windows are in the master and the left of the photo is one of the walk in closets in the master. There is a second walk in closet through the master bath. 

This is from in the master bedroom . The light is shining through the window that will be above the soaking sub in the master bath.

This will be our daughters room. It is the largest of the 3 bedrooms. 