These pictures are from two separate days. It only took 3 days for the house to go from just a foundation to what you see below. Hopefully the roof is finished soon and all the windows go in. I will feel better about the weather at least once that is done.
From the front. There is another Gable that will be added and the roof is just getting started. |
We went with the 3 car garage. |
This is the morning room. We kept the standard 3 windows that are included with the morning room. |
A view from the loft looking out to the front yard. |
In the garage, there is our front doo. I didnt think it would have a window, so that is a plus. |
The living room. The hole is where the gas fireplace will go. We chose to do it on the side so the protruding structure isn't taking up space in the back yard where we eventually plan to add a deck. |
Here is the kitchen. To the left is the morning room. On the right side is the door to the powder room. The fridge will be inset in the gap just to the left of the powder room door. |
Looking back from the front of the family room. |
Looking straight back from the family room. |
I didn't expect to have doubled up joists under the basement floor. This is a huge plus to me. As long as it was all glued and screwed it should make for a solid and squeak free floor. |
Here is the loft. The far room will be our office |
This is from in the master bedroom . The light is shining through the window that will be above the soaking sub in the master bath. |
This will be our daughters room. It is the largest of the 3 bedrooms. |