The roof is on and windows are in. We are out of the weather now which makes us feel quite a bit better!
From up the street.

The Fireplace was installed. 

The return and ventillation system is in. 

The morning room. 



This is from a second trip out. Most of the shingles are on, there is only two small spots remaining. The garage doors were installed as well. 
This is the air distribution system. The insulated flexible tubing seems more efficient than aluminum. 

The soaking tub was installed in the master bath. The shower will be next to it. 

We chose to have an Egress window installed in the basement. It lets quite a bit of light through which is a plus. 

The basement has been framed up. This is from under the morning room looking towards the front of the house. 

This is in the morning room. The ceilings are elevated. I really wish I had opted to have a ceiling fan rough in added to the morning room. I guess we can deal with that later. 

The kitchen sink will go here. 

They have installed the gas furnace. 

Happy with the large garage. 


The tub in the second bathroom upstairs. 

Our front door.